Your Gym.
Your Metrics.
Build routines, log every set, and track your strength progression with beautiful charts — all in one intuitive app.
Built by Soufiane H. as part of a broader iOS product portfolio.
Everything you need to
crush your goals
From building your first routine to analyzing long-term trends, Gymmetric keeps every workout tool in one polished, focused app.
Routine Builder
Create custom workout routines with exercises from a catalogue of 500+. Set target reps, sets, and weights for each exercise.
Session Logging
Log every set with reps and weight in real time. Track completion per exercise with satisfying animations and haptics.
Progress Charts
Beautiful interactive charts for every routine and exercise. Filter by week, month, or all-time to see your strength trajectory.
Workout History
Never lose track of what you lifted. Browse past sessions with detailed set breakdowns, dates, and performance summaries.
Exercise GIFs
Animated demonstrations for each exercise so you always know the proper form. Learn the movement before hitting the weights.
Privacy First
All workout data stays on your device. No accounts required, no cloud sync to worry about. Your data, your rules.
Get started in
three easy steps
Build Your Routine
Pick exercises from a rich catalogue, set your target reps and weights, and name your workout day.
Log Your Session
During your workout, log each set as you go. Track reps, weight, and completion with a fast, focused UI.
See Your Progress
Dive into interactive charts that show your strength trends over time — by exercise or by full routine.
A beautiful app for
serious training
Gymmetric is crafted with thoughtful iOS design patterns, smooth motion, haptic feedback, accessibility support, and a clean product feel end to end.
Multilingual
English, French, and Arabic with full RTL support.
Dark Mode
Beautiful in both light and dark, adapting to your system preference.
Accessible
Full VoiceOver support with descriptive labels and hints throughout.
Smart Charts
Tap any data point for detail tooltips. Filter by reps, sets, or volume.
Blazing Fast
Built with SwiftData and async actors. Zero lag, even with heavy history.
Offline First
No account needed. All data lives on-device. Train anywhere.
Gymmetric connects directly into the portfolio experience behind it.
Explore the portfolio to see the broader iOS engineering background, app work, and the product-focused approach that shaped this website and the app itself.
Privacy Policy
Your privacy matters to us. Gymmetric is designed with a privacy-first approach and keeps your workout data centered on your device.
📱 Data Storage
All workout data — routines, sessions, sets, and exercise logs — is stored locally on your device using Apple's SwiftData framework. Nothing is sent to external servers.
🚫 No Account Required
Gymmetric does not require you to create an account, provide an email, or sign in with any service. You can use the full app anonymously.
📡 Network Usage
The app may load exercise demonstration images from the internet. These requests do not include any personal data, workout history, or device identifiers.
💳 In-App Purchases
Subscriptions are handled entirely through Apple's StoreKit framework. Payment information is managed by Apple — Gymmetric never sees or stores your payment details.
📊 Analytics & Crash Reporting
Gymmetric uses Firebase Analytics and Firebase Crashlytics to understand how the app is used and to fix crashes. These collect anonymous usage events and crash logs — no personal workout data or identifiable information is included. No data is shared with advertisers or data brokers.
🗑️ Data Deletion
Since all data is stored on-device, deleting the app removes all your data completely. There is nothing stored on our servers to delete.
Ready to take control of your
fitness journey?
Download Gymmetric today and start building the body you want, one tracked session at a time.
Download on the App Store